Description
About the project
At the turn of the third and fourth quarter of 2020, apartments from the B1 building will be delivered along with internal infrastructure (roads, pedestrian paths), ground and underground parking spaces and green areas. The offer includes flats and apartments ranging from 31 to 106 sq m. with spacious balconies or terraces.
B1 - putting into use: at the turn of the third and fourth quarter of 2020.
The Central Park Apartments 2 investment is located in Stary Polesie, ul. Żwirki (0.6 km from the center of Łódź), is being developed by the developer Tree Development Group Sp. z o.o ..
The Central Park Apartments 2 investment is under construction with a commissioning date scheduled for Q3 2020.
The entire project consists of 169 new apartments. The buildings have 9 above-ground floors with a ground floor and 1 underground floor.