Description
House structure:
Ground floor - living room with dining room and kitchen, guest toilet, access to the terrace and private garden,
Second floor - two bedrooms with bathrooms and a terrace,
Third floor - master bedroom with bathroom, dressing room and terrace.
Future residents will have access to an outdoor swimming pool, as well as a parking space on the territory of the complex. Completion is scheduled for summer 2024.